<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Wind MENA</title><description>Independent wind energy intelligence for the Middle East, North Africa and Türkiye.</description><link>https://windmena.com/</link><language>en</language><item><title>Four years after the grant, the EIB awards a EUR 1.99 million feasibility contract for Morocco&apos;s offshore wind</title><link>https://windmena.com/insights/morocco-offshore-wind-feasibility-contract-43-months/</link><guid isPermaLink="true">https://windmena.com/insights/morocco-offshore-wind-feasibility-contract-43-months/</guid><description>The EIB contract for studies on a planned 1 GW project off Essaouira runs for up to 43 months, while construction is targeted to start in 2029.</description><pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Morocco</category></item><item><title>ACWA Power is building 1,500 km of line to carry 1.5 GW of Uzbek wind</title><link>https://windmena.com/insights/acwa-kungrad-uzbekistan-wind-grid/</link><guid isPermaLink="true">https://windmena.com/insights/acwa-kungrad-uzbekistan-wind-grid/</guid><description>A USD 3.06 billion package in Karakalpakstan bundles turbines, batteries and five substations. We read the grid scope as what sets the schedule.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Uzbekistan</category></item><item><title>On the Gulf of Suez, the deadliest part of a wind farm may be the line it does not route</title><link>https://windmena.com/insights/gulf-of-suez-who-prices-the-wire/</link><guid isPermaLink="true">https://windmena.com/insights/gulf-of-suez-who-prices-the-wire/</guid><description>A 2007 bird map still sorts Egypt&apos;s best wind land. The EBRD plan for a 550 MW plot puts most of the risk on a 47 km overhead line set by the authorities.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>Saudi power awards fell from USD 54.2 billion to USD 3.4 billion. Wind&apos;s money is waiting on Round 7</title><link>https://windmena.com/insights/saudi-power-awards-slow/</link><guid isPermaLink="true">https://windmena.com/insights/saudi-power-awards-slow/</guid><description>MEED data shows a sharp slowdown in 2026 contract awards. Round 7 bids for 2,200 MW of wind were due in September, but awards may slip into 2027.</description><pubDate>Wed, 07 Oct 2026 00:00:00 GMT</pubDate><category>Data</category><category>Saudi Arabia</category></item><item><title>Sonelgaz tenders 200 MW of wind in Laghouat and Djelfa, with bids due 25 November</title><link>https://windmena.com/insights/algeria-sonelgaz-200mw-wind-tender-laghouat-djelfa/</link><guid isPermaLink="true">https://windmena.com/insights/algeria-sonelgaz-200mw-wind-tender-laghouat-djelfa/</guid><description>Algeria&apos;s only operational wind farm on record is 10 MW near Adrar. The tender lets foreign firms bid alone, requires Algerian firms to partner with a foreign one and includes grid connection.</description><pubDate>Mon, 05 Oct 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Algeria</category></item><item><title>Scatec starts 900 MW Shadwan on a bridge loan, ahead of its project debt</title><link>https://windmena.com/insights/scatec-shadwan-bridge-loan/</link><guid isPermaLink="true">https://windmena.com/insights/scatec-shadwan-bridge-loan/</guid><description>Construction began on 1 October with USD 50 million of Arab Energy Fund bridge financing. Non-recourse debt is expected to close by the end of 2026.</description><pubDate>Mon, 05 Oct 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Oman books the world wind conference for December 2027, with two wind farms due first</title><link>https://windmena.com/insights/oman-wwec-2027/</link><guid isPermaLink="true">https://windmena.com/insights/oman-wwec-2027/</guid><description>The first World Wind Energy Conference in the Gulf gives Dhofar II and Jaalan Bani Bu Ali a public deadline.</description><pubDate>Fri, 02 Oct 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Masdar and Taaleri open the 154 MW Čibuk 2 wind farm, a winner of Serbia&apos;s first wind auction</title><link>https://windmena.com/insights/masdar-taaleri-cibuk-2-154mw-serbia-wind/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-taaleri-cibuk-2-154mw-serbia-wind/</guid><description>Čibuk 2 stands beside the 158 MW Čibuk 1 in southern Banat. Balkan Green Energy News reports the 312 MW complex as the largest in the Western Balkans.</description><pubDate>Thu, 17 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>UAE</category></item><item><title>O-Green installs a 9.6 MW wind turbine at Duqm to power Oman&apos;s turbine factory</title><link>https://windmena.com/insights/o-green-9-6mw-turbine-duqm-oman/</link><guid isPermaLink="true">https://windmena.com/insights/o-green-9-6mw-turbine-duqm-oman/</guid><description>The turbine near the OQ8 refinery stands on a 115-metre tower. Its power goes to Duqm industries, including the neighbouring Mawarid Turbine manufacturing facility.</description><pubDate>Wed, 16 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Alcazar closes financing on 131 MW Štip wind farm in North Macedonia on an unnamed corporate PPA</title><link>https://windmena.com/insights/alcazar-stip-wind-north-macedonia-financial-close/</link><guid isPermaLink="true">https://windmena.com/insights/alcazar-stip-wind-north-macedonia-financial-close/</guid><description>Phase one of Štip reached financial close with about EUR 115 million of senior debt from the EBRD, IFC and Erste Group Bank, and no government offtake support.</description><pubDate>Tue, 15 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>UAE</category></item><item><title>Heavy leading-edge erosion can cut wind output by up to 25%, and MENA builds in Gulf dust</title><link>https://windmena.com/insights/blade-leading-edge-erosion-gulf-dust-aviation/</link><guid isPermaLink="true">https://windmena.com/insights/blade-leading-edge-erosion-gulf-dust-aviation/</guid><description>Rolls-Royce runs synthetic desert dust through engines in a £1 billion durability programme. Sandia found blade erosion can cut annual energy production by 5 to 25 percent.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Masdar and RWE agree to consider joint bids in German offshore wind auctions, above EUR 3 billion</title><link>https://windmena.com/insights/masdar-rwe-german-offshore-wind-auctions-mou/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-rwe-german-offshore-wind-auctions-mou/</guid><description>A separate Masdar MoU with Luxcara covers storage and offshore wind, potentially above EUR 5 billion. Together they could open the way for more than EUR 8 billion of investment.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>UAE</category></item><item><title>Kazakhstan targets Q3 2029 full operation for Masdar&apos;s 1 GW Zhambyl wind plant</title><link>https://windmena.com/insights/kazakhstan-q3-2029-masdar-zhambyl-1gw-wind/</link><guid isPermaLink="true">https://windmena.com/insights/kazakhstan-q3-2029-masdar-zhambyl-1gw-wind/</guid><description>The Energy Ministry set the date ten weeks after the 29 June groundbreaking. The project pairs 1,000 MW of wind with 300 MW / 600 MWh of storage for about $1.4 billion.</description><pubDate>Wed, 09 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Kazakhstan</category></item><item><title>EIB appoints OWC-led consortium for feasibility study on Morocco&apos;s first offshore wind farm</title><link>https://windmena.com/insights/eib-owc-feasibility-study-morocco-offshore-wind/</link><guid isPermaLink="true">https://windmena.com/insights/eib-owc-feasibility-study-morocco-offshore-wind/</guid><description>The two-year study, endorsed by MASEN, targets the Atlantic coast near Essaouira and covers site selection, a met campaign, ports, grid integration and permitting.</description><pubDate>Tue, 08 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Morocco</category></item><item><title>Alcazar signs terms to buy Egypt&apos;s 580 MW Gabal El Zeit wind farms from NREA</title><link>https://windmena.com/insights/alcazar-gabal-el-zeit-580mw-privatisation/</link><guid isPermaLink="true">https://windmena.com/insights/alcazar-gabal-el-zeit-580mw-privatisation/</guid><description>The fund would take full operational responsibility for three Red Sea wind farms with turbines averaging eight to ten years of service, selling to EETC under a 25-year PPA.</description><pubDate>Mon, 07 Sep 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>PowerChina&apos;s Egyptian wind portfolio passes 1.8 GW across three projects</title><link>https://windmena.com/insights/powerchina-egypt-wind-portfolio-1-8gw/</link><guid isPermaLink="true">https://windmena.com/insights/powerchina-egypt-wind-portfolio-1-8gw/</guid><description>The contractor counts the operating 500 MW Amunet farm plus the 1.1 GW Gulf of Suez and Ras Ghareb projects under construction, with Elalamya on civil works.</description><pubDate>Mon, 07 Sep 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Oman&apos;s first wind turbine factory signs a university to train about 321 Omani graduates</title><link>https://windmena.com/insights/oman-mawarid-turbine-321-graduates-training/</link><guid isPermaLink="true">https://windmena.com/insights/oman-mawarid-turbine-321-graduates-training/</guid><description>Mawarid Turbine and the National University of Science and Technology agreed in February to train graduates in blade manufacturing and nacelle assembly for the Duqm plant.</description><pubDate>Thu, 03 Sep 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Masdar&apos;s 2 GW Bahrain wind deal cites three credentials that read as a near-shore specification</title><link>https://windmena.com/insights/masdar-bapco-bahrain-2gw-nearshore-wind/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-bapco-bahrain-2gw-nearshore-wind/</guid><description>In May 2024 Masdar and Bapco Energies agreed to explore up to 2 GW of near-shore and offshore wind in Bahrain, citing London Array, Dumat Al Jandal and the UAE Wind Program.</description><pubDate>Tue, 01 Sep 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Syria&apos;s 700 MW wind deal with Marv Energy plans 140 turbines from one factory in Homs</title><link>https://windmena.com/insights/syria-700mw-wind-marv-energy-homs-factory/</link><guid isPermaLink="true">https://windmena.com/insights/syria-700mw-wind-marv-energy-homs-factory/</guid><description>Syria&apos;s Ministry of Energy signed with Marv Energy in February. The company says production will take place at its Homs plant, in phases, over five to seven years.</description><pubDate>Mon, 31 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Syria</category></item><item><title>Oman&apos;s 125 MW Dhofar II wind farm will free about 76 million cubic metres of gas a year</title><link>https://windmena.com/insights/dhofar-ii-wind-frees-76-million-m3-gas-oman/</link><guid isPermaLink="true">https://windmena.com/insights/dhofar-ii-wind-frees-76-million-m3-gas-oman/</guid><description>Nama PWP&apos;s CEO put the gas figure beside 396,754 MWh of annual output. Oman shipped 11.9 million tonnes of LNG in 2025, above its 10.4 Mtpa liquefaction capacity.</description><pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Morocco&apos;s wind output rose 43% in 2024 on 18.5% more capacity, ANRE data shows</title><link>https://windmena.com/insights/morocco-wind-output-up-43-percent-2024/</link><guid isPermaLink="true">https://windmena.com/insights/morocco-wind-output-up-43-percent-2024/</guid><description>Installed wind reached 2,390 MW at end-2024 and generation 9,363 GWh, 21% of Moroccan electricity. IPPs took 47% of wind output and private operators 43%.</description><pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Morocco</category></item><item><title>Alfanar puts about USD 100 million more into Senvion India, the wind turbine maker it owns</title><link>https://windmena.com/insights/alfanar-100m-senvion-india-turbine-maker/</link><guid isPermaLink="true">https://windmena.com/insights/alfanar-100m-senvion-india-turbine-maker/</guid><description>The Saudi group is investing an additional 9.5 billion rupees in Senvion India, acquired in 2021, to fund its product roadmap, growth capital and project pipeline.</description><pubDate>Thu, 27 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>Oman tenders a renewables study for Musandam, where peak demand is forecast at 130 MW by 2031</title><link>https://windmena.com/insights/oman-musandam-renewables-feasibility-study/</link><guid isPermaLink="true">https://windmena.com/insights/oman-musandam-renewables-feasibility-study/</guid><description>Nama PWP put the Musandam study on sale on 24 August, covering solar, wind, hybrids and storage, with bids closing on 24 September.</description><pubDate>Wed, 26 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Goldwind&apos;s 82 MW Manisa order puts its Turkish medium-speed fleet on course to pass 150 turbines</title><link>https://windmena.com/insights/goldwind-aksa-manisa-turkiye-fleet-150-turbines/</link><guid isPermaLink="true">https://windmena.com/insights/goldwind-aksa-manisa-turkiye-fleet-150-turbines/</guid><description>Goldwind signed with Aksa Energy for 11 GWH182-8.0 MW turbines at the 82.16 MW Manisa wind-plus-storage project, with long-term service support included.</description><pubDate>Mon, 24 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Alcazar&apos;s 500 MW Egyptian wind pair heads for construction before its grid line routing is fixed</title><link>https://windmena.com/insights/alcazar-niat-rasgha-500mw-egypt-construction/</link><guid isPermaLink="true">https://windmena.com/insights/alcazar-niat-rasgha-500mw-egypt-construction/</guid><description>Two 250 MW farms near Ras Ghareb are guided to start construction this quarter, at a cost of USD 572 million per the EIB&apos;s project summary. Routing of the two 220 kV lines is still to be confirmed.</description><pubDate>Fri, 21 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Tunisia can tender 1,200 MW of wind; another 800 MW waits on wind speed assessments</title><link>https://windmena.com/insights/tunisia-800mw-wind-waits-on-wind-data/</link><guid isPermaLink="true">https://windmena.com/insights/tunisia-800mw-wind-waits-on-wind-data/</guid><description>Of six wind sites cleared in December, three totalling 1,200 MW go to tender. Three more, 800 MW, wait on wind data: over three times Tunisia&apos;s roughly 245 MW fleet.</description><pubDate>Fri, 21 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Tunisia</category></item><item><title>Masdar and ScottishPower finish 95 foundations at the 1.4 GW East Anglia Three offshore farm</title><link>https://windmena.com/insights/masdar-east-anglia-three-foundations-complete/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-east-anglia-three-foundations-complete/</guid><description>The GBP 4 billion project 69 km off Suffolk, owned 50:50, has turbine installation under way and is expected to be fully operational by year end.</description><pubDate>Wed, 19 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>United Kingdom</category></item><item><title>EBRD weighs up to $192 million of senior debt for Scatec&apos;s 900 MW Shadwan wind plant</title><link>https://windmena.com/insights/ebrd-192m-debt-scatec-shadwan-900-mw-wind/</link><guid isPermaLink="true">https://windmena.com/insights/ebrd-192m-debt-scatec-shadwan-900-mw-wind/</guid><description>Shadwan Wind at Ras Shukeir holds a 25-year EETC PPA and is expected to benefit from an EU first-loss guarantee under the EFSD+ Hi-Bar programme.</description><pubDate>Tue, 18 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>EETC chair Mona Rezk signs Egypt&apos;s wind PPAs and the contracts for the wires</title><link>https://windmena.com/insights/eetc-mona-rezk-egypt-wind-offtaker/</link><guid isPermaLink="true">https://windmena.com/insights/eetc-mona-rezk-egypt-wind-offtaker/</guid><description>EETC&apos;s FY2025/26 plan approves EGP 44.9 billion of investment, a 3.4% transmission loss target and three more control centres for renewable integration.</description><pubDate>Mon, 17 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>Iraq&apos;s first wind projects arrive as a 600 MW Diyala land title and a 500 MW feasibility study</title><link>https://windmena.com/insights/iraq-wind-diyala-land-nic-500-mw-study/</link><guid isPermaLink="true">https://windmena.com/insights/iraq-wind-diyala-land-nic-500-mw-study/</guid><description>In June Iraq approved 20,000 dunams in Diyala for a 1.6 GW solar and wind complex. The National Investment Commission had already completed a 500 MW wind study.</description><pubDate>Fri, 14 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Iraq</category></item><item><title>Oman&apos;s Riyah wind farms and North Oman Solar report roughly 150 jobs and 30% local spend</title><link>https://windmena.com/insights/oman-riyah-150-jobs-local-content/</link><guid isPermaLink="true">https://windmena.com/insights/oman-riyah-150-jobs-local-content/</guid><description>OQ Alternative Energy says Omanis made up about 40% of the development and construction workforce across the three projects, which total more than 330 MW.</description><pubDate>Fri, 14 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Türkiye sets its first offshore wind auction for the first quarter of 2027</title><link>https://windmena.com/insights/turkiye-first-offshore-wind-auction-q1-2027/</link><guid isPermaLink="true">https://windmena.com/insights/turkiye-first-offshore-wind-auction-q1-2027/</guid><description>Energy Minister Alparslan Bayraktar said the tender will be published in September, with details due ahead of COP31 in Antalya. The target is 5,000 MW offshore by 2035.</description><pubDate>Thu, 13 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Tunisia operates about 245 MW of wind and has drawn up a pipeline eight times that size</title><link>https://windmena.com/insights/tunisia-wind-pipeline-eight-times-fleet/</link><guid isPermaLink="true">https://windmena.com/insights/tunisia-wind-pipeline-eight-times-fleet/</guid><description>In January Tunisia cleared wind lots at Tabaga, Jebel Abderrahmane and El Guettar, and Scatec, with partner Aeolus, was awarded a 25-year PPA with STEG for the 75 MW El Fahs project.</description><pubDate>Tue, 11 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Tunisia</category></item><item><title>From a Jordan grant to Ras Shokeir&apos;s commercial close, MENA wind runs on three kinds of money</title><link>https://windmena.com/insights/mena-wind-three-kinds-of-money/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-three-kinds-of-money/</guid><description>A UAE-funded 25 MW farm in Ma&apos;an, USD 226 million of ADB, AIIB and Standard Chartered debt for Bash II, and Ras Shokeir&apos;s pending close span the region&apos;s cost of capital.</description><pubDate>Mon, 10 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Nordex lands a 72-turbine, 525 MW order for Türkerler&apos;s YEKA-5 Sivas wind project</title><link>https://windmena.com/insights/nordex-525-mw-turkerler-sivas-order/</link><guid isPermaLink="true">https://windmena.com/insights/nordex-525-mw-turkerler-sivas-order/</guid><description>The N175/6.X turbines start installation in Q3 2027 on 108 metre towers, with service extendable to 25 years. Nordex calls it the biggest single turbine deal in Türkiye.</description><pubDate>Mon, 10 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Turbine makers earn better margins on service, and Dumat Al Jandal&apos;s 20 years went to Vestas</title><link>https://windmena.com/insights/wind-service-margins-dumat-al-jandal-vestas/</link><guid isPermaLink="true">https://windmena.com/insights/wind-service-margins-dumat-al-jandal-vestas/</guid><description>Nordex posted a 19.2% service EBIT margin against 12.2% on projects in Q1. Saudi Arabia&apos;s first utility-scale wind farm came with a 20-year Vestas service agreement attached.</description><pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Yanbu port lands nine wind turbines, including 27 blades, for Saudi Arabia&apos;s Setara and Shaqra projects</title><link>https://windmena.com/insights/yanbu-port-nine-turbines-setara-shaqra/</link><guid isPermaLink="true">https://windmena.com/insights/yanbu-port-nine-turbines-setara-shaqra/</guid><description>The Pacific Titan docked at King Fahd Industrial Port with one of the largest cargoes the port has handled, the Saudi Press Agency reported on 5 August.</description><pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>EETC signs PPA with Alcazar Energy for a 407 MW wind plant at Zafarana</title><link>https://windmena.com/insights/eetc-alcazar-407-mw-zafarana-wind-ppa/</link><guid isPermaLink="true">https://windmena.com/insights/eetc-alcazar-407-mw-zafarana-wind-ppa/</guid><description>The plant targets 2028 operation and around 775,000 households. EETC chairwoman Mona Rezk tied it to upgrading Egypt&apos;s unified national grid.</description><pubDate>Wed, 05 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Saudi Arabia&apos;s 75% localisation mandate set against the wind factories MENA actually built</title><link>https://windmena.com/insights/mena-wind-localisation-rules-vs-factories/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-localisation-rules-vs-factories/</guid><description>Türkiye ties YEKA support to 51% domestic content and 65% for towers and blades. Morocco and Oman built plants after securing demand, and Egypt has a Sany memorandum.</description><pubDate>Wed, 05 Aug 2026 00:00:00 GMT</pubDate><category>Data</category><category>MENA</category></item><item><title>Jordan signs EPC contract for 25 MW Batn Al Ghul wind project, fully funded by the UAE</title><link>https://windmena.com/insights/jordan-batn-al-ghul-25-mw-uae-funded-epc/</link><guid isPermaLink="true">https://windmena.com/insights/jordan-batn-al-ghul-25-mw-uae-funded-epc/</guid><description>Samra Electric Power Generation Company hired SITE Technology General Contracting for five turbines in Ma&apos;an Governorate, under Jordan&apos;s February agreement with Masdar.</description><pubDate>Tue, 04 Aug 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Jordan</category></item><item><title>Egypt rated 380 sq km of Beni Suef land at 2 GW for wind or 20 GW for solar</title><link>https://windmena.com/insights/egypt-beni-suef-land-wind-vs-solar-ratio/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-beni-suef-land-wind-vs-solar-ratio/</guid><description>At that ten-to-one ratio, Egypt&apos;s 3,028 MW wind fleet would cover about 575 sq km. Its next big wind farm, ENGIE&apos;s 900 MW Ras Shokeir, is again on the Gulf of Suez.</description><pubDate>Mon, 03 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>35 of 104 towers on Hans Bruins&apos; second Egyptian wind farm were made in Egypt</title><link>https://windmena.com/insights/egypt-wind-towers-35-of-104-localisation/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-wind-towers-35-of-104-localisation/</guid><description>The Ras Ghareb Wind Energy and Red Sea Wind Energy CEO told EnterpriseAM that customs clearance fell from weeks to four or five days between his first and second projects.</description><pubDate>Mon, 03 Aug 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>Masdar buys brand-new wind in Spain as Alcazar takes on Egypt&apos;s older Gabal El-Zeit fleet</title><link>https://windmena.com/insights/masdar-spain-new-wind-vs-egypt-gabal-el-zeit/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-spain-new-wind-vs-egypt-gabal-el-zeit/</guid><description>Masdar is taking 49.99% of a 705 MW Repsol portfolio valued at EUR 849 million, all online since 2025. Alcazar signed definitive agreements to acquire the 580 MW Gabal El-Zeit wind farm, with USD 420 million of external financing.</description><pubDate>Fri, 31 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>UAE</category></item><item><title>Egypt plans to add 21 GW of renewables by 2029, with wind rising fivefold to 15 GW</title><link>https://windmena.com/insights/egypt-roadmap-21-gw-renewables-15-gw-wind/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-roadmap-21-gw-renewables-15-gw-wind/</guid><description>A roadmap presented to Prime Minister Mostafa Madbouly takes renewables from 9.5 GW to 30.7 GW by end-2029, against 11.21 GW planned by end-2026.</description><pubDate>Thu, 30 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>MENA added 886 MW of wind in 2025, and Egypt built 829 MW of it</title><link>https://windmena.com/insights/mena-wind-2025-build-886-mw-egypt/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-2025-build-886-mw-egypt/</guid><description>IRENA puts the ten-market MENA fleet at 6,943 MW at end-2025. Eight markets added nothing, while Türkiye alone added 1,910 MW.</description><pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate><category>Data</category><category>MENA</category></item><item><title>Oman&apos;s largest wind farm will sell all 234 MW to an oil field operator, not the national grid</title><link>https://windmena.com/insights/oman-riyah-wind-sells-all-power-to-pdo/</link><guid isPermaLink="true">https://windmena.com/insights/oman-riyah-wind-sells-all-power-to-pdo/</guid><description>Riyah 1 and 2 supply Petroleum Development Oman under long-term PPAs, with commercial operation due in December 2026. Nama PWP&apos;s three tendered wind IPPs have not yet been awarded.</description><pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Two wind datasets put Middle East and Africa at 15.2 GW and 31.2 GW, and Türkiye is the gap</title><link>https://windmena.com/insights/mea-wind-capacity-datasets-turkiye-gap/</link><guid isPermaLink="true">https://windmena.com/insights/mea-wind-capacity-datasets-turkiye-gap/</guid><description>Windpower Intelligence counts 31.2 GW at end-2025 and GWEC counts 15.2 GW. Subtract Türkiye from the first and the two land within half a gigawatt.</description><pubDate>Tue, 28 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>MENA</category></item><item><title>Egypt bills wind farm land at a minimum of 2% of the energy it generates</title><link>https://windmena.com/insights/egypt-wind-land-usufruct-two-percent/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-wind-land-usufruct-two-percent/</guid><description>Cabinet Resolution 54 of 2023 sets NREA&apos;s usufruct charge for up to 25 years from commercial operation. Sites can be auctioned on the percentage itself.</description><pubDate>Mon, 27 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Egypt</category></item><item><title>ACWA Power&apos;s 40 MW Khalladi expansion is Morocco building on what already works</title><link>https://windmena.com/insights/acwa-khalladi-40-mw-expansion-morocco/</link><guid isPermaLink="true">https://windmena.com/insights/acwa-khalladi-40-mw-expansion-morocco/</guid><description>ACWA Power has a permit to lift Khalladi in northern Morocco from 120 to 160 MW for about MAD 550 million, with completion expected within two years.</description><pubDate>Fri, 24 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Morocco</category></item><item><title>Türkiye&apos;s 7 to 11 cent offshore wind band sits over four times above Saudi Arabia&apos;s Al Ghat onshore price</title><link>https://windmena.com/insights/turkiye-offshore-band-7-11-cents-vs-gulf-onshore/</link><guid isPermaLink="true">https://windmena.com/insights/turkiye-offshore-band-7-11-cents-vs-gulf-onshore/</guid><description>Draft YEKA OWPP-2026 rules cover four sea areas, a 49-year operating right and 25 percent domestic content. Saudi Arabia&apos;s Al Ghat cleared onshore wind at 1.566 cents.</description><pubDate>Tue, 21 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Türkiye</category></item><item><title>O-Green&apos;s Mustafa Al Hinai signed for 2.7 GW built to deliver nearly 770 MW around the clock</title><link>https://windmena.com/insights/o-green-al-hinai-2-7-gw-round-the-clock/</link><guid isPermaLink="true">https://windmena.com/insights/o-green-al-hinai-2-7-gw-round-the-clock/</guid><description>His contract with Nama PWP covers the Continuous Renewable Energy Project across Mahout and Duqm, with commercial operations targeted for summer 2028.</description><pubDate>Mon, 20 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Oman</category></item><item><title>Türkiye opens YEKA-2026 with 1,500 MW of onshore wind across seven auctions</title><link>https://windmena.com/insights/turkiye-yeka-2026-1500-mw-wind/</link><guid isPermaLink="true">https://windmena.com/insights/turkiye-yeka-2026-1500-mw-wind/</guid><description>Energy Minister Alparslan Bayraktar launched the 2.4 GW tender on 13 July with a €0.055/kWh ceiling and a €0.035/kWh wind floor. Applications close 13 October.</description><pubDate>Thu, 16 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Enerjisa Üretim lines up $180 million arranged by FMO, with $80 million from DEG, for 250 MW of Muğla wind</title><link>https://windmena.com/insights/enerjisa-180-million-fmo-deg-yeka-2-wind/</link><guid isPermaLink="true">https://windmena.com/insights/enerjisa-180-million-fmo-deg-yeka-2-wind/</guid><description>The syndicated package funds three Enercon-supplied wind farms in Muğla. DEG already financed nine Enerjisa YEKA-2 plants totalling 750 MW.</description><pubDate>Wed, 15 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Saudi Arabia&apos;s sub-2-cent wind tariff faces its first operating year before Round 7</title><link>https://windmena.com/insights/saudi-sub-2-cent-wind-first-operating-year/</link><guid isPermaLink="true">https://windmena.com/insights/saudi-sub-2-cent-wind-first-operating-year/</guid><description>Al-Ghat cleared at 1.566 cents per kWh and is now fully grid-connected, with Wa&apos;ad Al Shamal synchronised behind it. Operating data from Q3 2026 arrives as Round 7 wind is bid.</description><pubDate>Sat, 11 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>Saudi Arabia</category></item><item><title>Oman&apos;s grid operator schedules over 2 GW of wind for connection between 2027 and 2030</title><link>https://windmena.com/insights/oman-oetc-2-gw-wind-2027-2030/</link><guid isPermaLink="true">https://windmena.com/insights/oman-oetc-2-gw-wind-2027-2030/</guid><description>OETC&apos;s Five-Year Annual Capability Statement 2026-2030 also lists 5.7 GW of solar and a 1 GW round-the-clock project, lifting renewables from about 7% to 30%.</description><pubDate>Thu, 09 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Four parties now sign separate pieces of a single MENA wind farm</title><link>https://windmena.com/insights/mena-wind-counterparty-stack-fragmented/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-counterparty-stack-fragmented/</guid><description>SPPC signs tariffs, MIGA the risk cover, DFIs the debt and Tahya Misr the financing, in deals from Saudi Arabia to Egypt.</description><pubDate>Wed, 08 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>MENA wind logged a milestone at five layers of its value chain in eight days</title><link>https://windmena.com/insights/mena-wind-five-value-chain-milestones-one-week/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-five-value-chain-milestones-one-week/</guid><description>A Sany factory MoU in Egypt, Türkiye&apos;s offshore auction draft, MIGA cover for ACWA Power&apos;s Suez project, Masdar&apos;s Zhambyl groundbreaking and two Saudi grid syncs.</description><pubDate>Sat, 04 Jul 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Masdar breaks ground on 1 GW, $1.4 billion Zhambyl wind farm in Kazakhstan</title><link>https://windmena.com/insights/masdar-zhambyl-1gw-wind-kazakhstan/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-zhambyl-1gw-wind-kazakhstan/</guid><description>The project adds a 600 MWh battery and more than 400 km of new transmission. Masdar also signed a roadmap for Kazakhstan&apos;s first round-the-clock clean energy project.</description><pubDate>Wed, 01 Jul 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Kazakhstan</category></item><item><title>Türkiye publishes draft rules for its first 1 GW offshore wind auction</title><link>https://windmena.com/insights/turkiye-draft-rules-first-1gw-offshore-wind-auction/</link><guid isPermaLink="true">https://windmena.com/insights/turkiye-draft-rules-first-1gw-offshore-wind-auction/</guid><description>YEKA OWPP-2026 sets a $0.07 to $0.11 per kWh price band, a 49-year operating right and 25 percent domestic content. Consultation runs to August 17.</description><pubDate>Tue, 30 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>MIGA backs ACWA Power&apos;s 1.1 GW Suez wind farm in Egypt with a $193.3 million guarantee</title><link>https://windmena.com/insights/miga-guarantee-acwa-power-suez-wind/</link><guid isPermaLink="true">https://windmena.com/insights/miga-guarantee-acwa-power-suez-wind/</guid><description>The cover layers onto a $703.6 million senior debt facility closed in January 2025. Full commercial operation is targeted for Q2 2027.</description><pubDate>Mon, 29 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Acwa Power wins approval to expand Morocco&apos;s Khalladi wind farm from 120 MW to 160 MW</title><link>https://windmena.com/insights/acwa-power-khalladi-wind-expansion-morocco/</link><guid isPermaLink="true">https://windmena.com/insights/acwa-power-khalladi-wind-expansion-morocco/</guid><description>The 40 MW extension is estimated to cost MAD 550 million ($60 million), with completion targeted inside two years.</description><pubDate>Fri, 26 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Morocco</category></item><item><title>Egypt signs MoU with Sany for a 2 GW turbine factory and a 2,000 MW Gulf of Suez wind farm</title><link>https://windmena.com/insights/sany-egypt-mou-2gw-factory-2gw-wind-farm/</link><guid isPermaLink="true">https://windmena.com/insights/sany-egypt-mou-2gw-factory-2gw-wind-farm/</guid><description>EETC, NREA and SANY Renewable Energy signed with Prime Minister Mostafa Madbouly present. The wind farm is to be financed in Egyptian pounds.</description><pubDate>Thu, 25 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Saudi Arabia&apos;s 600 MW Al-Ghat wind farm reaches full grid connection on all 80 turbines</title><link>https://windmena.com/insights/al-ghat-600mw-full-grid-connection/</link><guid isPermaLink="true">https://windmena.com/insights/al-ghat-600mw-full-grid-connection/</guid><description>EPC contractor SEPCOIII confirmed final installation on June 2 and full grid synchronization within eight days. Output is projected at 4.2 TWh a year.</description><pubDate>Wed, 24 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>Korra Energi consortium wins $58 million of Egypt&apos;s Gulf of Suez wind transmission lines</title><link>https://windmena.com/insights/korra-energi-gulf-of-suez-500kv-lots/</link><guid isPermaLink="true">https://windmena.com/insights/korra-energi-gulf-of-suez-500kv-lots/</guid><description>Korra Energi and HIDELECO won Lots 1 and 3 of a transmission project linking Gulf of Suez wind farms to Egypt&apos;s national grid.</description><pubDate>Wed, 17 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Three MENA wind deals in 60 days bundle sites, technologies and supply chains into single awards</title><link>https://windmena.com/insights/mena-wind-platform-procurement-bundled-deals/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-platform-procurement-bundled-deals/</guid><description>Egypt&apos;s 4,750 MW Tahya Misr protocol, Oman&apos;s 2.7 GW O-Green contract and Sany&apos;s Egypt factory each package several pieces at once.</description><pubDate>Fri, 05 Jun 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Sany Group will invest more than 300 million dollars in Egypt&apos;s first wind turbine factory</title><link>https://windmena.com/insights/sany-egypt-300m-wind-turbine-factory-sczone/</link><guid isPermaLink="true">https://windmena.com/insights/sany-egypt-300m-wind-turbine-factory-sczone/</guid><description>The plant in the Suez Canal Economic Zone is tied first to a planned 1,000 MW wind project in the northern Gulf of Suez.</description><pubDate>Thu, 04 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>O-Green plans a 58 MW Duqm wind pilot with six 9.6 MW turbines, the Middle East&apos;s largest</title><link>https://windmena.com/insights/o-green-58-mw-duqm-wind-pilot-9-6-mw-turbines/</link><guid isPermaLink="true">https://windmena.com/insights/o-green-58-mw-duqm-wind-pilot-9-6-mw-turbines/</guid><description>The pilot is expected to generate around 190 GWh a year to decarbonise the wind turbine plant O-Green is building in the same economic zone.</description><pubDate>Tue, 02 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>IEA says Gulf war repairs could curb overseas energy investment, the capital behind stakes like Masdar&apos;s in Dogger Bank</title><link>https://windmena.com/insights/iea-gulf-war-repairs-overseas-wind-investment/</link><guid isPermaLink="true">https://windmena.com/insights/iea-gulf-war-repairs-overseas-wind-investment/</guid><description>Analysts put the repair bill, including Iran, as high as 58 billion dollars. GCC investors sent a net 271 billion dollars abroad in 2025, per BNP Paribas.</description><pubDate>Mon, 01 Jun 2026 00:00:00 GMT</pubDate><category>Brief</category><category>MENA</category></item><item><title>MENA&apos;s next gigawatt-scale wind PPA may come from a hyperscaler rather than a utility</title><link>https://windmena.com/insights/mena-wind-hyperscaler-ppa/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-hyperscaler-ppa/</guid><description>IRENA&apos;s firm-cost benchmark, Masdar&apos;s 1 GW round-the-clock project and the Egypt-Saudi HVDC link line up with buyers that need power around the clock.</description><pubDate>Mon, 01 Jun 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Nordex starts production at a 1,200-blade-a-year plant in Türkiye&apos;s Izmir Free Trade Zone</title><link>https://windmena.com/insights/nordex-menemen-blade-plant-turkiye-1200-blades/</link><guid isPermaLink="true">https://windmena.com/insights/nordex-menemen-blade-plant-turkiye-1200-blades/</guid><description>The Menemen plant makes blades for the N163 and N175 platforms, with initial output for YEKA-4 and YEKA-5 and surplus reserved for European projects.</description><pubDate>Fri, 29 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Saudi Arabia added 1,512 MW of wind in 2025, up 287 percent, as regional additions hit 2.6 GW</title><link>https://windmena.com/insights/saudi-arabia-1512-mw-wind-2025-mena-additions/</link><guid isPermaLink="true">https://windmena.com/insights/saudi-arabia-1512-mw-wind-2025-mena-additions/</guid><description>Saudi Arabia accounted for 57.8 percent of Africa-Middle East additions. Morocco added 261 MW, while Morocco and Egypt both still hold larger installed bases.</description><pubDate>Wed, 27 May 2026 00:00:00 GMT</pubDate><category>Data</category><category>MENA</category></item><item><title>The 3,000 MW Egypt-Saudi HVDC link will let MENA wind cross a border at gigawatt scale</title><link>https://windmena.com/insights/egypt-saudi-hvdc-mena-wind-cross-border/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-saudi-hvdc-mena-wind-cross-border/</guid><description>The first 1,500 MW phase is scheduled before the end of Q2 2026. Türkiye is planning 14,700 km of HVDC lines of its own.</description><pubDate>Tue, 26 May 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Oman&apos;s 2.7 GW O-Green award shows the state moving into MENA wind equity</title><link>https://windmena.com/insights/state-sponsor-mena-wind-oman-o-green-egypt/</link><guid isPermaLink="true">https://windmena.com/insights/state-sponsor-mena-wind-oman-o-green-egypt/</guid><description>Oman awarded the first of two planned round-the-clock renewables plants to state-backed O-Green Energy in the same week Egypt&apos;s president reviewed a 7,000 MW pipeline.</description><pubDate>Sat, 23 May 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>MENA is moving wind procurement from megawatts to round-the-clock firm output</title><link>https://windmena.com/insights/mena-wind-procurement-round-the-clock-firm-output/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-procurement-round-the-clock-firm-output/</guid><description>Oman has signed a 2.7 GW round-the-clock hybrid and plans a 1,000 MW round-the-clock tender, and these contracts pay wind for the hours solar leaves empty.</description><pubDate>Fri, 22 May 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Oman signs a 2.7 GW round-the-clock wind, solar and storage PPA with O-Green Energy</title><link>https://windmena.com/insights/oman-o-green-2-7-gw-round-the-clock-ppa/</link><guid isPermaLink="true">https://windmena.com/insights/oman-o-green-2-7-gw-round-the-clock-ppa/</guid><description>Nama Power and Water Procurement awarded the hybrid project across the Mahout and Duqm areas. The energy minister called it the first of two planned round-the-clock plants.</description><pubDate>Wed, 20 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Egypt&apos;s president reviews a 7,000 MW renewables pipeline and confirms 900 MW Ras Shokeir for 2027</title><link>https://windmena.com/insights/egypt-el-sisi-review-7000-mw-ras-shokeir-2027/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-el-sisi-review-7000-mw-ras-shokeir-2027/</guid><description>El-Sisi met the prime minister and electricity minister on 18 May. The review also covered Obelisk solar Phase 2, 1,700 MW Minya solar and 4,000 MW of battery storage.</description><pubDate>Tue, 19 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Tower and turbine plants in three countries are turning MENA wind into an industrial policy story</title><link>https://windmena.com/insights/mena-wind-industrial-policy-towers-turbines/</link><guid isPermaLink="true">https://windmena.com/insights/mena-wind-industrial-policy-towers-turbines/</guid><description>Al Yamamah Steel&apos;s Yanbu towers, Mawarid Turbine&apos;s Duqm plant and Egypt&apos;s talks with Sany Group point to a supply chain race.</description><pubDate>Mon, 18 May 2026 00:00:00 GMT</pubDate><category>Analysis</category><category>MENA</category></item><item><title>Oman plans three wind IPP tenders and a 1,000 MW round-the-clock renewables project in 2026</title><link>https://windmena.com/insights/oman-nama-pwp-three-wind-ipps-1gw-round-the-clock/</link><guid isPermaLink="true">https://windmena.com/insights/oman-nama-pwp-three-wind-ipps-1gw-round-the-clock/</guid><description>Nama PWP&apos;s 2025 annual report lists Duqm III at 300 MW, Al Jazir at 100 MW and Shaleem at 100 MW, all scheduled for commercial operation in Q2 2029.</description><pubDate>Mon, 18 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Masdar and RWE win UK consent for the 3 GW Dogger Bank South offshore wind project</title><link>https://windmena.com/insights/masdar-rwe-dogger-bank-south-3gw-consent/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-rwe-dogger-bank-south-3gw-consent/</guid><description>Masdar holds 49 percent and RWE 51 percent. When the partners signed in 2023, the first 800 MW was planned for 2029, with full commissioning by the end of 2031.</description><pubDate>Thu, 14 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>United Kingdom</category></item><item><title>Türkiye declares 2026 the year of wind with 1,500 MW for YEKA auctions and a 5 GW offshore target</title><link>https://windmena.com/insights/turkiye-2026-year-of-wind-yeka-offshore/</link><guid isPermaLink="true">https://windmena.com/insights/turkiye-2026-year-of-wind-yeka-offshore/</guid><description>Energy Minister Alparslan Bayraktar named four offshore zones and a grid plan of roughly 30 billion dollars, including 14,700 km of HVDC lines.</description><pubDate>Wed, 13 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>ACWA Power signs USD 226 million of debt for the 300 MW Bash II wind farm in Uzbekistan</title><link>https://windmena.com/insights/acwa-power-bash-ii-uzbekistan-wind-debt/</link><guid isPermaLink="true">https://windmena.com/insights/acwa-power-bash-ii-uzbekistan-wind-debt/</guid><description>ADB, AIIB and Standard Chartered provide a package covering more than two thirds of project cost. The farm in southwestern Uzbekistan targets commercial operation in H2 2027.</description><pubDate>Sun, 10 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Uzbekistan</category></item><item><title>Egypt&apos;s electricity minister reviews 1,500 MW of Alcazar Energy wind projects</title><link>https://windmena.com/insights/egypt-reviews-alcazar-1500-mw-wind/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-reviews-alcazar-1500-mw-wind/</guid><description>Mahmoud Esmat met Alcazar founder Daniel Calderon on 7 May on a 500 MW project at Zaafarana and a 1,000 MW farm in south Hurghada, delivered in two phases.</description><pubDate>Sat, 09 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>IRENA puts firm wind plus battery power at USD 59 to 94 per MWh in 2025, below new gas</title><link>https://windmena.com/insights/irena-firm-lcoe-wind-plus-battery/</link><guid isPermaLink="true">https://windmena.com/insights/irena-firm-lcoe-wind-plus-battery/</guid><description>IRENA&apos;s new firm cost benchmark sees hybrid wind and battery costs falling to USD 49 to 75 per MWh by 2030. New gas globally tops USD 100.</description><pubDate>Fri, 08 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>MENA</category></item><item><title>Egypt resumes talks with Sany on its first wind turbine factory, tied to a 2,000 MW pipeline</title><link>https://windmena.com/insights/egypt-sany-wind-turbine-factory-talks/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-sany-wind-turbine-factory-talks/</guid><description>Electricity Minister Mahmoud Esmat met Sany in Cairo to advance plans first pitched in January 2026.</description><pubDate>Wed, 06 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Morocco&apos;s ONEE sets out a 3,500 MW storage roadmap to 2030</title><link>https://windmena.com/insights/morocco-onee-3500-mw-storage-roadmap/</link><guid isPermaLink="true">https://windmena.com/insights/morocco-onee-3500-mw-storage-roadmap/</guid><description>The plan pairs storage with 4,500 MW of flexible gas capacity and 6,000 km of new very high voltage lines, inside a programme of more than MAD 180 billion to 2030.</description><pubDate>Wed, 06 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Morocco</category></item><item><title>Egypt-Saudi HVDC link completes final testing, with the first 1,500 MW due before the end of Q2</title><link>https://windmena.com/insights/egypt-saudi-hvdc-interconnection-final-commissioning/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-saudi-hvdc-interconnection-final-commissioning/</guid><description>The 1,350 km link runs from East Medina and Tabuk to Badr City east of Cairo and reaches 3,000 MW once both phases are operational. The project is priced at USD 1.8 billion.</description><pubDate>Tue, 05 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Egypt signs for 4,750 MW of wind and 4,000 MWh of storage, and targets 45% renewables by 2028</title><link>https://windmena.com/insights/egypt-tahya-misr-4750-mw-wind-storage/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-tahya-misr-4750-mw-wind-storage/</guid><description>Tahya Misr Holding Company will lead financing and implementation, with electricity priced in Egyptian pounds and a two-year delivery window. The wind farms sit along the Gulf of Suez corridor.</description><pubDate>Tue, 05 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Saudi Arabia&apos;s 3 GW, 12 GWh battery storage tender closes qualification on 5 May</title><link>https://windmena.com/insights/saudi-sppc-3-gw-12-gwh-battery-storage-tender/</link><guid isPermaLink="true">https://windmena.com/insights/saudi-sppc-3-gw-12-gwh-battery-storage-tender/</guid><description>SPPC&apos;s six build-own-operate projects are each sized at 500 MW and 2 GWh. The tranche follows a first wave of 2 GW and 8 GWh.</description><pubDate>Mon, 04 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>Turkey added 300 MW of wind in Q1 2026 and TÜREB projects 2.5 GW for the full year</title><link>https://windmena.com/insights/turkey-300-mw-wind-q1-2026/</link><guid isPermaLink="true">https://windmena.com/insights/turkey-300-mw-wind-q1-2026/</guid><description>TÜREB puts Q1 wind investment at about USD 350 million, after more than USD 2 billion and 2 GW in 2025. TÜREB&apos;s head expects Ankara&apos;s first offshore wind tenders by year end.</description><pubDate>Mon, 04 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Türkiye</category></item><item><title>Masdar and ScottishPower install the first 14 MW turbine at East Anglia THREE, with 115 metre blades</title><link>https://windmena.com/insights/masdar-scottishpower-east-anglia-three-record-blades/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-scottishpower-east-anglia-three-record-blades/</guid><description>It is the UK&apos;s largest wind turbine. The 95-turbine, GBP 4 billion farm off Suffolk will power about 1.3 million homes when it comes online later this year.</description><pubDate>Sat, 02 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>United Kingdom</category></item><item><title>Egypt plans a global tender for a 390 km, 500 kV line to carry Gulf of Suez wind</title><link>https://windmena.com/insights/egypt-500-kv-gulf-of-suez-transmission-tender/</link><guid isPermaLink="true">https://windmena.com/insights/egypt-500-kv-gulf-of-suez-transmission-tender/</guid><description>The line is valued at EGP 12 billion, around USD 226 million, with completion scheduled for mid-2027. The plan targets projects by Scatec and Orascom Construction in particular.</description><pubDate>Fri, 01 May 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Saudi Arabia added a record 1,512 MW of wind in 2025, 57.8% of all Africa Middle East additions</title><link>https://windmena.com/insights/saudi-record-1512-mw-wind-2025-gwec/</link><guid isPermaLink="true">https://windmena.com/insights/saudi-record-1512-mw-wind-2025-gwec/</guid><description>GWEC&apos;s Africa Middle East report puts regional additions at 2.6 GW in 2025 and cumulative capacity at 15.2 GW. Saudi Arabia&apos;s installed base rose to 2,324 MW from 812 MW.</description><pubDate>Thu, 30 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>Sembcorp lifts its Oman portfolio to 1.1 GW, including the 125 MW Dhofar II wind project</title><link>https://windmena.com/insights/sembcorp-oman-1-1-gw-dhofar-ii-wind/</link><guid isPermaLink="true">https://windmena.com/insights/sembcorp-oman-1-1-gw-dhofar-ii-wind/</guid><description>Dhofar II, developed with OQ Alternative Energy, has a 20-year PPA with Nama PWP and targets commercial operation in Q3 2027.</description><pubDate>Wed, 29 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>AfDB and ILX channel USD 40 million of European pension money into Egypt&apos;s 1.1 GW wind project</title><link>https://windmena.com/insights/afdb-ilx-egypt-1-1-gw-wind-pension-finance/</link><guid isPermaLink="true">https://windmena.com/insights/afdb-ilx-egypt-1-1-gw-wind-pension-finance/</guid><description>ILX signed on 20 April for a funded risk participation in a USD 140 million AfDB senior debt facility, the first deal under a partnership agreed in 2023.</description><pubDate>Tue, 28 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Egypt</category></item><item><title>Jordan and Masdar sign an agreement for a fully UAE-funded 25 MW wind farm in Ma&apos;an</title><link>https://windmena.com/insights/jordan-masdar-uae-funded-25-mw-maan-wind/</link><guid isPermaLink="true">https://windmena.com/insights/jordan-masdar-uae-funded-25-mw-maan-wind/</guid><description>Five turbines will go up in Batn Al-Ghul. Masdar handles technical oversight and supervision, while Samra Electric Power Generation Company appoints the EPC contractor and runs operations.</description><pubDate>Mon, 27 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Jordan</category></item><item><title>Masdar turns 20 with a portfolio above 65 GW and a 100 GW target for 2030</title><link>https://windmena.com/insights/masdar-20-years-65-gw-portfolio/</link><guid isPermaLink="true">https://windmena.com/insights/masdar-20-years-65-gw-portfolio/</guid><description>Masdar&apos;s portfolio capacity now exceeds 65 GW. It plans USD 30 to 35 billion in new equity and project finance to reach 100 GW, adding about 10 GW a year.</description><pubDate>Sat, 25 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>UAE</category></item><item><title>Morocco&apos;s installed wind capacity reached 2.63 GW at the end of 2025, up from 2.37 GW</title><link>https://windmena.com/insights/morocco-wind-capacity-2-63-gw-end-2025/</link><guid isPermaLink="true">https://windmena.com/insights/morocco-wind-capacity-2-63-gw-end-2025/</guid><description>An Attaqa.net report puts renewables above 46 percent of Morocco&apos;s electricity generation, against a 52 percent target for 2030. Wind is now the second largest source of electricity after coal.</description><pubDate>Fri, 24 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Morocco</category></item><item><title>Mawarid Turbine signs for a Duqm plant to make 800 to 1,000 MW of wind turbines a year</title><link>https://windmena.com/insights/mawarid-turbines-duqm-wind-turbine-factory/</link><guid isPermaLink="true">https://windmena.com/insights/mawarid-turbines-duqm-wind-turbine-factory/</guid><description>OPAZ granted land in the Special Economic Zone at Duqm in January. Phase one, valued at about RO70 million, covers turbine components and blades; phase two adds a tower factory.</description><pubDate>Sun, 19 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Oman</category></item><item><title>Al Yamamah Steel signs SAR 126 million tower deal for Saudi Arabia&apos;s 700 MW Yanbu wind farm</title><link>https://windmena.com/insights/al-yamamah-steel-yanbu-wind-towers-contract/</link><guid isPermaLink="true">https://windmena.com/insights/al-yamamah-steel-yanbu-wind-towers-contract/</guid><description>The contract supplies steel wind towers to EPC contractor SEPCO3, which won the Round 4 Yanbu EPC award in July 2025.</description><pubDate>Sat, 18 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Saudi Arabia</category></item><item><title>IRENA&apos;s 13 April advisory sets out a renewables playbook for the Middle East energy shock</title><link>https://windmena.com/insights/irena-energy-crisis-to-energy-security-advisory/</link><guid isPermaLink="true">https://windmena.com/insights/irena-energy-crisis-to-energy-security-advisory/</guid><description>&quot;Renewables: From Energy Crisis to Energy Security&quot; urges fast-tracked distributed renewables, time-of-use tariffs and hybrid mini-grids, anchored in a record 692 GW of renewables added globally in 2025.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>MENA</category></item><item><title>Wind covered 21% of Morocco&apos;s electricity demand in 2024 as output rose 43% to 9,363 GWh</title><link>https://windmena.com/insights/morocco-wind-21-percent-electricity-2024/</link><guid isPermaLink="true">https://windmena.com/insights/morocco-wind-21-percent-electricity-2024/</guid><description>Installed wind capacity reached 2,390 MW, up 19% year on year, and wind is now Morocco&apos;s largest renewable source. MASEN approved a 1.7 GW renewable programme set to launch in 2026.</description><pubDate>Mon, 13 Apr 2026 00:00:00 GMT</pubDate><category>Brief</category><category>Morocco</category></item></channel></rss>